Based on the stats collected in Google Analytics and in the online lead spreadsheet, you’ll already know what cost per lead you want in each category. Our team’s job is to keep budgets for each product group and campaign under constant control to get the most leads and sales at a cost that works for you
1. Agreeing on KPIs for month 2
2. Creating additional Search campaigns
3. Creating additional Display Network campaigns based on the defined audience personas
4. Optimizing Search campaigns:
analyzing stats by keyword
analyzing search terms and building additional negative keyword lists
pausing underperforming keywords
finding the optimal ad position for the project
5. Optimizing Display Network campaigns:
analyzing the performance of responsive display ads (adjusting or pausing underperformers)
analyzing placements (moving converting placements into separate campaigns) and excluding underperforming ones
6. Restructuring the ad accounts
7. A/B testing ads in Search and Display campaigns
8. Testing new automated bid strategies
9. Improving Quality Score
11. Monitoring daily budget and spend
12. Monitoring daily conversions and their cost
13. Testing and monitoring assets
14. Adjusting bids according to the strategy agreed at the KPI stage
15. Creating new experiments with settings and targeting methods
16. Analyzing the results of the first campaigns by audience persona
17. Adjusting campaign settings and targeting based on audience personas
18. Analyzing and optimizing campaigns by ad schedule (all campaigns)
19. Analyzing and adjusting campaigns by location
20. Analyzing and forecasting spend and drafting a new budget for the next management period
21. Analyzing campaign performance by device
23. Bid adjustments by a specialist (daily at first, then at least once a week during the first month)
24. Traffic filtering and negative keyword list updates (daily at first (the first 2 weeks), then 1–2 times a week)
25. Monitoring budget, number of conversions and their cost (budget daily, cost every 3 days during the first month)
26. Reviewing metrics with the client every 2 weeks
27. Quality control of the project work
29. Discussing changes to the plan/strategy for month 3 based on results.
22. Analyzing demographics (gender, age, etc.) based on the stats collected. Adjusting campaigns based on the data